Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System

Bruno Falcón Silveira (Department of Structural and Construction Engineering, Federal University of Bahia, Salvador, Brazil)
Dayana Bastos Costa (Department of Structural and Construction Engineering, Federal University of Bahia, Salvador, Brazil)

Construction Innovation

ISSN: 1471-4175

Article publication date: 23 January 2023

Issue publication date: 14 June 2024

385

Abstract

Purpose

Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles.

Design/methodology/approach

The research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method.

Findings

The results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models.

Originality/value

The primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.

Keywords

Acknowledgements

This work was supported by the Fundação Escola Politécnica da Bahia (FEP)/Gráfico Empreendimentos [grant number 23006.014928/2019-21].

Citation

Silveira, B.F. and Costa, D.B. (2024), "Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System", Construction Innovation, Vol. 24 No. 4, pp. 1005-1025. https://doi.org/10.1108/CI-02-2022-0030

Publisher

:

Emerald Publishing Limited

Copyright © 2022, Emerald Publishing Limited

Related articles