Preventive Maintenance in a Multiple Shift and High Volume Manufacturing Operation
International Journal of Operations & Production Management
ISSN: 0144-3577
Article publication date: 1 October 1993
Abstract
Shows how to implement a preventive maintenance (PM) system in a high volume manufacturing operation with a just‐in‐time environment. Determines the tasks that are performance‐coupled in a specific machine by using a simple flowchart. Computes for every component suitable for PM, earliest economic replacement time and earliest expected replacement time. Using a time graph, the PM is scheduled for components that are performance coupled in a specific machine. This procedure is straightforward and can be easily followed by plant floor personnel.
Keywords
Citation
Osborne, D. and Taj, S. (1993), "Preventive Maintenance in a Multiple Shift and High Volume Manufacturing Operation", International Journal of Operations & Production Management, Vol. 13 No. 10, pp. 76-83. https://doi.org/10.1108/01443579310045572
Publisher
:MCB UP Ltd
Copyright © 1993, MCB UP Limited