To read this content please select one of the options below:

Rapid changeover – a pre‐requisite for responsive manufacture

A.R. Mileham (University of Bath, Bath, UK)
S.J. Culley (University of Bath, Bath, UK)
G.W. Owen (University of Bath, Bath, UK)
R.I. McIntosh (University of Bath, Bath, UK)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 August 1999

2743

Abstract

The ability to effect rapid changeover on a manufacturing line, from one product to another, is a key pre‐requisite for increased flexibility, lead time reduction and responsive manufacture. However it is a rarity for changeover times to be part of the design specification of a new machine tool or tooling system and even when it is, there are few design guidelines for translating the required changeover time into reality. This paper describes a set of “design for changeover” rules that have been derived from action research, carried out within a variety of companies. The rules address the design of machines, tooling, ancillary equipment and the products themselves and their use has been shown, through case studies, to lead to a significant reduction in changeover time and a leaner, more responsive manufacturing environment.

Keywords

Citation

Mileham, A.R., Culley, S.J., Owen, G.W. and McIntosh, R.I. (1999), "Rapid changeover – a pre‐requisite for responsive manufacture", International Journal of Operations & Production Management, Vol. 19 No. 8, pp. 785-796. https://doi.org/10.1108/01443579910274383

Publisher

:

MCB UP Ltd

Copyright © 1999, MCB UP Limited

Related articles