Application of fuzzy logic control model to Gantt charting preventive maintenance scheduling
International Journal of Quality & Reliability Management
ISSN: 0265-671X
Article publication date: 1 April 2006
Abstract
Purpose
The simultaneous scheduling of resource‐constrained maintenance and operations is addressed in this work. The purpose of the paper is to capture the uncertainty in the development of a model that schedules both preventive maintenance and operational activities. Fuzzy logic is employed to transform the human expertise into IF‐THEN rules.
Design/methodology/approach
The approach has the advantage of revealing semantic uncertainty with the associated non‐specifying measures. The methodology applied tracks the error values in terms of results in linguistic variable.
Findings
The results obtained indicate the feasibility of tracking the uncertain measures in the model discussed. Thus, the study may be applicable to both production system and transportation organizations that are engaged in both maintenance and operational activities.
Practical implications
The research has serious implication in terms of the ability to monitor the imprecision that were introduced in the previous models. This obviously provides a more reliable framework for researchers and practitioners interested in maintenance scheduling activities.
Originality/value
The paper is new in that it demonstrates the application of fuzzy logic in a form that was never documented.
Keywords
Citation
Oke, S.A. and Charles‐Owaba, O.E. (2006), "Application of fuzzy logic control model to Gantt charting preventive maintenance scheduling", International Journal of Quality & Reliability Management, Vol. 23 No. 4, pp. 441-459. https://doi.org/10.1108/02656710610657620