Modeling the relationship between value management implementation phases, critical success factors and overall project success

Ahmed Farouk Kineber (Department of Civil Engineering, College of Engineering in Al-Kharj, Prince Sattam bin Abdulaziz University, Al Kharj, Saudi Arabia)
Idris Othman (Department of Civil and Environmental Engineering, Universiti Technologi PETRONAS, Seri Iskandar, Malaysia)
Ayodeji Emmanuel Oke (Department of Quantity Surveying, Federal University of Technology Akure, Akure, Nigeria)
Nicholas Chileshe (UniSA STEM, Sustainable Infrastructure and Resource Management (SIRM), University of South Australia, Adelaide, Australia and Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa)
Tarek Zayed (Department of Building and Real Estate (BRE), Faculty of Construction and Environment (FCE), The Hong Kong Polytechnic University, Kowloon, Hong Kong)

Construction Innovation

ISSN: 1471-4175

Article publication date: 4 April 2023

204

Abstract

Purpose

This study aims to develop an overall project success (OPS) model by investigating the mediation impact of value management (VM) implementation between VM critical success factors (CSFs) and OPS as well as the moderation impact of VM CSFs between VM implementation and OPS.

Design/methodology/approach

In total, 335 structured questionnaires were administered to relevant stakeholders in the study area. The research used a partial least square structural equation modeling (PLS-SEM) to model the relationship among VM implementation, CSFs and OPS.

Findings

The results revealed that there is an indirect positive and significant correlation among the variables. The model prediction analysis also significantly impacted with 59.9% on OPS by setting VM implementation as a mediator variable and 61% by setting VM CSFs as a moderation variable.

Practical implications

This research work will serve as a guide or benchmark for decision-makers who want to use VM to improve the success of their building projects.

Originality/value

This study fills the knowledge gap by identifying and emphasizing the impact of VM CSFs and activities on OPS.

Keywords

Acknowledgements

This study is supported via funding from Prince sattam bin Abdulaziz University project number (PSAU/2023/R/1444).

Citation

Kineber, A.F., Othman, I., Oke, A.E., Chileshe, N. and Zayed, T. (2023), "Modeling the relationship between value management implementation phases, critical success factors and overall project success", Construction Innovation, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/CI-01-2022-0018

Publisher

:

Emerald Publishing Limited

Copyright © 2023, Emerald Publishing Limited