A blueprint paradox : Successful but unintended cross-national translation of total productive maintenance

Monica Rolfsen (Department of Industrial Economics and Technology Management, The Norwegian University of Science and Technology (NTNU), Trondheim, Norway)

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Article publication date: 7 October 2014

487

Abstract

Purpose

The purpose of this paper is to investigate if a manufacturing concept such as total productive maintenance (TPM) can be copied from one location to another.

Design/methodology/approach

Qualitative data were gathered from a single case. This includes interviews, participatory observation and document collection.

Findings

The authors present a company with an intention to make a pure copy from one location to another, and with identical technology, production equipment, owners, customers and products, the conditions for copying should thus be as sufficient as possible. However, several minor adjustments led to a translated version showing better results than the original.

Research limitations/implications

The paper provides a deep understanding of a unique case, but should be supplemented with more data in order to reach general conclusions. The main theoretical contribution is to develop an understanding of translation processes different from copying concepts by expanding models of change and transfer from a purely planned perspective to explaining success through the unplanned change of organizational vehicles better fit to the intended tools and techniques.

Practical implications

Many companies struggle with implementing total productive maintenance, and implementation and translation aspects are lacking in the literature. The paper provides an understanding on how TPM-practice was changed and adjusted when travelling from one location to another within the same company.

Originality/value

Few case studies on TPM and implementation have been described. The authors show in detail how minor adjustments led to wider changes, arguing that a pure copy is not possible. By including institutional theory focusing on translation, new insight on implementation of TPM is provided.

Keywords

Citation

Rolfsen, M. (2014), "A blueprint paradox : Successful but unintended cross-national translation of total productive maintenance", Journal of Quality in Maintenance Engineering, Vol. 20 No. 4, pp. 402-414. https://doi.org/10.1108/JQME-07-2012-0024

Publisher

:

Emerald Group Publishing Limited

Copyright © 2014, Emerald Group Publishing Limited

Related articles