To read this content please select one of the options below:

Training Site Teams in the Civil Engineering Industry: The second of a series of three articles on the problems for management involved with temporary systems

Bev Walters (Bev Walters is Staff Development Manager, Richard Costain Ltd)

Journal of European Industrial Training

ISSN: 0309-0590

Article publication date: 1 May 1977

40

Abstract

Outside its Head Office a Civil Engineering Company has a collection of transitory organisations, large and small, each created to complete a particular construction project. These teams must operate efficiently for about two years until the contract is complete and the team can be disbanded. So Civil Engineering companies must be able to create and maintain effective project teams. This involves:

Citation

Walters, B. (1977), "Training Site Teams in the Civil Engineering Industry: The second of a series of three articles on the problems for management involved with temporary systems", Journal of European Industrial Training, Vol. 1 No. 5, pp. 22-23. https://doi.org/10.1108/eb002278

Publisher

:

MCB UP Ltd

Copyright © 1977, MCB UP Limited

Related articles