Construction Innovation: Volume 7 Issue 2

Information, Process, Management

Subject:

Table of contents

Controlling construction waste by implementing governmental ordinances in Hong Kong

Vivian W.Y. Tam, L.Y. Shen, Ivan W.H. Fung, J.Y. Wang

Owing to limited space, reducing the waste going to landfills has become a pressing issue in Hong Kong. As most of the solid waste was generated from construction activity, the…

2514

Estimating productivity using simulation: A case study of Gaza beach embankment protection project

R.N. Rustom, A. Yahia

Recently, there has been increased interest in the use of simulation for real‐time planning, scheduling, control of construction projects and obtaining optimum productivity. The…

1070

A systematic procedure for developing the 3D model to evaluate the construction project progress

Zubair Ahmed Memon, Muhd Zaimi Abd., Mushairry Mustaffar

This main purpose of this study is to summarize the experience at the Construction Technology and Management Center (CTMC) to develop a Digitalizing Construction Monitoring (DCM…

1152

Application of line‐of‐balance and 4D CAD for lean planning

A. Björnfot, R. Jongeling

The purpose of this paper is to suggest the application of the line‐of‐balance (LoB) scheduling technique in combination with a 4D CAD workspace model as a method to improve the…

1587
Cover of Construction Innovation

ISSN:

1471-4175

Online date, start – end:

2001

Copyright Holder:

Emerald Publishing Limited

Open Access:

hybrid

Editors:

  • Dr Anil Sawhney
  • Professor Srinath Perera