Login

Login
Welcome:
Guest

Search for:


Browse:

Bannner: Aslib individual membership.
 
Journal search
Journal cover: Engineering, Construction and Architectural Management

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Online from: 1994

Subject Area: Built Environment

Content: Latest Issue | icon: RSS Latest Issue RSS | Previous Issues

Options: To add Favourites and Table of Contents Alerts please take a Emerald profile

Previous article.Icon: Print.Table of Contents.Next article.Icon: .

Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge


Document Information:
Title:Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge
Author(s):Diana White, (Department of Communication and Systems, The Open University, Milton Keynes, UK), Joyce Fortune, (Department of Communication and Systems, The Open University, Milton Keynes, UK)
Citation:Diana White, Joyce Fortune, (2012) "Using systems thinking to evaluate a major project: The case of the Gateshead Millennium Bridge", Engineering, Construction and Architectural Management, Vol. 19 Iss: 2, pp.205 - 228
Keywords:Case studies, Construction management, Project management, Systems design, United Kingdom
Article type:Case study
DOI:10.1108/09699981211206124 (Permanent URL)
Publisher:Emerald Group Publishing Limited
Abstract:

Purpose – The purpose of this paper is to set out the results of a study of a major landmark construction project and to use systems thinking to shed light on the organisation, management and performance of the project.

Design/methodology/approach – The three main methods of gathering the data were a series of formal and informal interviews with representatives of Gateshead Metropolitan Borough Council and their main project partner Harbour and General, regular visits to the main construction site and the secondary site where the bridge was pre-fabricated and an extensive study of newspaper and magazine articles, Council minutes and memoranda and other relevant literature. The paper also employs a systems-based approach whereby the project is represented as a system and compared with an ideal model of a system that is capable of purposeful action without failure.

Findings – This paper has shown that shown that, although many aspects of the management of this construction project such as its decision-making processes were very effective, the project was over budget and significantly late. Analysis using systems thinking has been able to reveal that the problems encountered during the construction were caused by unforeseen environmental influences and failure to appreciate the viewpoints of those directly and indirectly affected by the project. It is suggested that the lessons learned from investigating this project in real time can provide a valuable insight into understanding the challenges faced by similar projects.

Originality/value – Unlike many reports of similar-sized projects, this case study uses data gathered throughout the life of a lengthy construction project. It uses these data to conduct an assessment of project performance and evaluate the way the project was managed. The method used to do this is transferable to a wide variety of design and engineering projects and is of value to academics and practitioners alike.



Fulltext Options:

Login

Login

Existing customers: login
to access this document

Login


- Forgot password?

- Athens/Institutional login

Purchase

Purchase

Downloadable; Printable; Owned
HTML, PDF (846kb)Purchase

To purchase this item please login or register.

Login


- Forgot password?

Recommend to your librarian

Complete and print this form to request this document from your librarian


Marked list

Bookmark & share

Reprints & permissions

© Emerald Group Publishing Limited  |  Copyright information  |  Site policies  |  Cookie information
.