To read this content please select one of the options below:

Mapping of synchronous activities through virtual management momentum simulation

V. Beran (Faculty of Civil Engineering, Czech Technical University in Prague, Prague, Czech Republic)
P. Dlask (Faculty of Civil Engineering, Czech Technical University in Prague, Prague, Czech Republic)
D. Eaton (Salford School of the Built Environment, University of Salford, Salford, UK)
E. Hromada (Faculty of Civil Engineering, Czech Technical University in Prague, Prague, Czech Republic)
O. Zindulka (Faculty of Civil Engineering, Czech Technical University in Prague, Prague, Czech Republic)

Construction Innovation

ISSN: 1471-4175

Article publication date: 19 April 2011

677

Abstract

Purpose

This paper seeks to present an approach to the improvement of the risk analysis of construction projects by linking risk analysis to the potential variances in time and cost performance of endogenous variables. This link is synchronous, such that changes in either the cost or time schedule variables are uniquely modelled to the overall time and cost profile of a project.

Design/methodology/approach

The presented approach is based on synchronous time and cost scheduling, simulation and the methodology presented here develops technical indicators on the basis of virtual management momentum (VMM).

Findings

The paper shows a potential improvement to management decision making by the use of VMM. Senior management can test alternative strategies and develop probability matrices defining the potential results.

Research limitations/implications

The current model simulates the impact of endogenous risks, and therefore by implication excludes all exogenous risks. This limitation can be removed by the introduction of other risk vectors, but is beyond the scope of the current research.

Originality/value

The mapping technique utilised to display these changes makes the appreciation of such impacts visually simple and is extremely effective in improving the management of endogenous project risk.

Keywords

Citation

Beran, V., Dlask, P., Eaton, D., Hromada, E. and Zindulka, O. (2011), "Mapping of synchronous activities through virtual management momentum simulation", Construction Innovation, Vol. 11 No. 2, pp. 190-211. https://doi.org/10.1108/14714171111124167

Publisher

:

Emerald Group Publishing Limited

Copyright © 2011, Emerald Group Publishing Limited

Related articles