Imperfect maintenance model for estimating aircraft fleet availability

Aleksandar Knezevic (Department of Air Force, University of Defense, Belgrade, Serbia)
Ljubisa Vasov (Division of Aircraft, University of Belgrade, Belgrade, Serbia)
Slavisa Vlacic (Department of Air Force, University of Defense, Belgrade, Serbia)
Cedomir Kostic (Air Forces and Air Defense, Serbian Armed Forces, Belgrade, Serbia)

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 6 March 2017

401

Abstract

Purpose

The purpose of this paper is to define conditions under which improved availability of fleet of G-4 jet trainers is obtained, and optimization of intermediate-level maintenance through imperfect maintenance model application. This research has been conducted based on available knowledge, and experience gained by performing intermediate-level maintenance of Serbian Air Force aircrafts.

Design/methodology/approach

Analysis of the data collected from daily maintenance reports, and the analysis of maintenance technology and organization, was performed. Based on research results, a reliability study was performed. Implementation of imperfect maintenance with its models of maintenance policies (especially a quasi-renewal process and its treating of reliability and optimal maintenance) was proposed to define new maintenance parameters so that the greater level of availability could be achieved.

Findings

The proposed methodology can potentially be applied as a simple tool to estimate the present maintenance parameters and to quickly point out some deficiencies in the analyzed maintenance organization. Validation of this process was done by conducting a reliability case study of G-4 jet trainer fleet, and numerical computations of optimal maintenance policy.

Research limitations/implications

The methodology of the availability estimation when reliability parameters were not tracked by the maintenance organization, and optimization of intermediate-level maintenance, has so far been applied on G-4 jet trainers. Moreover, it can be potentially applied to other aircraft types.

Originality/value

Availability estimation and proposed optimization of intermediate maintenance is based on a survey of data for three years of aircraft fleet maintenance. It enables greater operational readiness (due to a military rationale) with possible cost reduction as a consequence but not as a goal.

Keywords

Citation