To read this content please select one of the options below:

Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam: A qualitative research study

Linh Hong Pham (Petrovietnam Gas Joint Stock Corporation (PVGAS), Hi Chi Minh, Vietnam)
Harimurti Hadikusumo (School of Engineering and Technology, Asian Institute of Technology, Khlong Luang, Thailand)

International Journal of Energy Sector Management

ISSN: 1750-6220

Article publication date: 1 April 2014

1675

Abstract

Purpose

Petrochemical projects play a very important role in the economic development of Vietnam. For the past ten years, many large-scale petrochemical plants have been developed using the engineering, procurement and construction (EPC) project delivery system for completing the project faster. However, many projects have suffered from schedule delays. In order to solve the delay problem, a clear understanding of the EPC business model and its delays problems are studied in this research. A qualitative research method by using case study on selected EPC projects was adopted. This paper aims to define the current business models used in the Vietnamese petrochemical industry and explores the root cause of delays.

Design/methodology/approach

The research methodology used in this study is multiple case studies by purposive sampling on EPC projects. This is chosen due to the limited number of EPC projects in petrochemical in Vietnam and to obtain schedule delay factors from both delayed and on-time projects. In this purposive sampling, the researcher decided on what needs to know and sets out to find the people who can and are willing to share their information. From each project, project manager and project engineer were interviewed to understand the delay factors in their EPC projects. Data from the interview were analyzed by using “pattern coding” described by Miles and Huberman. Then, cross-case analysis was used to identify the common and unique factors occurring in each case. By comparing the three cases, the authors can identify the delay factors in EPC petrochemical in Vietnam.

Findings

By interviewing the management level officers in three cases and performing exploratory work on the secondary data, it was observed that the local and foreign contractors of EPC projects in Vietnam have generally similar business process. Then, the codes were grounded based on the EPC business process, and subjected to the cross-case analysis. The root cause of problems in each phase was provided.

Originality/value

The paper fulfills an identified root cause of EPC projects in Vietnam.

Keywords

Citation

Hong Pham, L. and Hadikusumo, H. (2014), "Schedule delays in engineering, procurement, and construction petrochemical projects in Vietnam: A qualitative research study", International Journal of Energy Sector Management, Vol. 8 No. 1, pp. 3-26. https://doi.org/10.1108/IJESM-06-2013-0009

Publisher

:

Emerald Group Publishing Limited

Copyright © 2014, Emerald Group Publishing Limited

Related articles