Table of contents
POE — a horror story?
It is almost unprecedented for any practical consequences to result from a conference — getting things done is not what academics are famous for. Nevertheless, in Portsmouth and…
Economic review: Office premises costs — services: operation, maintenance and repair
The total cost of building services can be divided into three sections — initial capital costs (outside the scope of these articles), energy costs (dealt with last month) and…
Case study: National Westminster Tower, London
At 183 metres high and 52 storeys, the tallest cantilevered structure in Europe is an imposing landmark in the City of London — but does it make sense as a commercial building?
Telecommunications in the UK
Good communications and good business are inseparable — and yet an unofficial telecommunications hierarchy has been allowed to build up in the UK founded on nothing more rational…
Analysis: office lighting design
Lighting information covers a wide spectrum, from the highly technical to the highly subjective. To narrow the focus for the facilities manager we brought together a panel of…
ISSN:
0263-2772Online date, start – end:
1983Copyright Holder:
Emerald Publishing LimitedOpen Access:
hybridEditors:
- Dr Joseph Lai
- Dr Sarel Lavy